We are trying to figure out how to put a 10' wide storm sewer structure in right now that has 5 utilities running down the center. The utilities are all about 6" to 12" above the invert of a 24" pipe.Boy you aint lying. I have had to do a whole lot of real world modifications to engineers screw ups to make stuff work.
How in the world is there always at least one catch basin on every road move project that falls right in the middle of a utility line that was just replaced to get it out of the way of the new construction.
Engineering.